Replaced 9 large semi-hermetic compressors in condenser units on roof
The Bridgewater Country Club
Carmel, IN
Replaced 13 Roof Top Units and 4 Exhaust Fans
Manufacturing Facility serving the Automotive Industry
Anderson, IN
Design and Build all Plumbing, HVAC and Process Systems
395,000 sq ft
Manufacturing Facility serving the Automotive Industry
Anderson, IN
Design and Build all Plumbing, HVAC and Process Systems
325,000 sq ft
Cummins Seymour Engine Plant
Engine Test Cell 9 Expansion – Process Piping
Seymour, IN
Praxair
Installation of a new VM-120 Oxygen Plant in an existing operating facility. Equipment and Piping install.
Wheatridge, CO
Air Liquide
Air Separation Plant - Equipment Set and Industrial Process Piping
Pittsboro, IN
Frito Lay
New Harvest Chip Line - Process Piping
Frankfort, IN
KYB Manufacturing
New Plant Manufacturing Expansion. Design Build: HVAC, Plumbing, Process Piping
Franklin, IN
ELSA
140,000 Sq. Ft. Plant Expansion - Design Build: HVAC, Plumbing, Process Piping
Design and change over from an open loop cooling tower process cooling water system to a closed loop fluid cooler process cooling water system.
Elwood, IN
Colorcon
New Food Supplement Expansion – Process Piping
Indianapolis, IN
Industrial Dielectrics Inc.
New Plant Expansion – HVAC, Plumbing, Process Piping